For GCs & construction managers
The final-clean and low-voltage partner that hits your handover date.
On a mission critical build, the final clean and the low-voltage scope are where schedules slip and accountability blurs. You want a sub who shows up clean, documented, and insured — and who can carry both the particle-count sign-off and the cabling plant.
The pressure you're under
What's actually on the line.
- ▰Final clean compressed against an immovable handover date
- ▰Multiple low-voltage and cleaning subs to coordinate
- ▰Sign-off documentation owners and CxA actually accept
How we help
What High Plains MC brings.
Handover-grade final clean
Post-construction cleaning to ISO Class 8 with a signed particle-count report for handover and CxA acceptance.
One sub, two scopes
Final clean and structured cabling from a single insured, background-checked crew — fewer subs on your critical path.
Insured & documented
$2M general + $1M professional liability, safety record, and as-built documentation that closes out the job.
One vendor, two scopes
Cleaning and cabling, accountable to you.
Fewer crews inside your white space, one security posture, one point of contact — for the full mission critical scope.
Approved-vendor ready
We clear the bar to get on your list.
- ▰ISO 14644-1:2022 Class 8 methods
- ▰BICSI-certified cabling design & install
- ▰Background-checked, drug-screened techs
- ▰NDA-ready · badge & escort protocols
- ▰$2M general + $1M professional liability
- ▰ASHRAE TC 9.9 / IEST-aligned process
Let's talk about your general contractors scope.
Tell us the market, the scope, and the timeline. We'll come back with a plan, a price, and the documentation your approved-vendor process needs.